VESSEL NAME Assessment date 00/00/00 Review date 00/00/00 RISK ASSESSMENT |
||||||
Description of activity |
Describe an operational or emergency
procedure of your vessel. |
|||||
Assessment methods (Circle options)
:
Systematic walk around survey,
or, Or specify other method:
Task
analysis & stakeholder consultation, or Independent
audit, or Ships
safety reportage documentation audit. |
||||||
Primary considerations (Circle
options) : Specify Other:
Falls Falling objects Heat or cold Noise Atmosphere Electrical Fire or explosion Cranes or hoists Pressure
vessels Confined spaces Manual handling Hazardous materials |
||||||
Risk assessment and primary control
measures: (Use
overleaf for full control plan) |
||||||
|
Fatal/Disaster |
Critical |
Major |
Minor |
Negligible |
|
Very likely |
1 |
1 |
2 |
3 |
3 |
|
Likely
|
1 |
2 |
3 |
4 |
4 |
|
Unlikely |
2 |
3 |
4 |
4 |
5 |
|
Very unlikely |
3 |
3 |
4 |
5 |
5 |
|
Control
actioned |
1= immediately. 2 =
within 24hrs. 3 = within 48hrs. 4 = monthly. 5 = as priority. |
|||||
Position Name Signed Date Ranger Hope © 2008 |
||||||
VESSEL NAME Assessment date 00/00/00 Review date 00/00/00 CONTROL PLANS Choose an operatal procedure undertaken by your vessel. |
|
Risk 1 |
|
Control methods (Circle options) : Elimination
- remove Engineering
- substitute, isolate,
segregate, redesign, Administration
- procedures, signage, training Rescue/recovery
-PPE’s, procedures, standby Detail:
|
|
Risk 2 |
|
Control methods (Circle options) : Elimination
- remove Engineering
- substitute, isolate,
segregate, redesign, Administration
- procedures, signage, training Rescue/recovery
-PPE’s, procedures, standby Detail:
|
|
Risk 3 |
|
Control methods (Circle options) : Elimination
- remove Engineering
- substitute, isolate,
segregate, redesign, Administration
- procedures, signage, training Rescue/recovery
-PPE’s, procedures, standby Detail:
|
|
Position Name Signed Date Ranger Hope © 2008 |